MQH Construction Pictures - November 02, 2002

The roof is almost complete and more brickwork has been done. Much of the material that had been stored in front of the new building has been used and/or removed.

Much of the new sprinkler system has been installed in the sanctuary. Rather than using scaffolds as originally thought, a small cherry picker has been used to do the work. The cherry picker is removed from the sanctuary for masses.

Click on the thumbnail or on the description to see the full sized photo. Note that each full-sized picture is between 35K and 70K


Pictures of the Parish Center area:

From the front - 1



From the front - 2



From the front - 3



From the front - 4



From the front - 5



From the front - 6



From the front - 7



From the back - 1



From the back - 2



From the back - 3



From the back - 4



Back

This page was updated on November 23, 2002